A55 Pen-Y-Clip Foot Bridges

In 2009 two foot/cycle bridges were completed to provide a safe route for pedestrians and cyclists over the A55 trunk road in North Wales. A-C-Ds services were acquired to provide full coordination of the project providing General Arrangement drawings and a Production Manufacturing package. This included coordination of GPS site surveys imported in to Tekla Structures to ensure correct alignment of the bridge span sections and location of structural columns.

Pen-Y-Clip Foot & Cycle Bridge-GA01

Pen-Y-Clip Foot & Cycle Bridge-GA02

Pen-Y-Clip Foot & Cycle Bridge-GA03

Pen-Y-Clip Foot & Cycle Bridge-GA04

Previous
Previous

Eagles Meadow Footbridge

Next
Next

Sainsbury's Staircases